The RF shielding room project is done with a 3m Anechoic chamber, it is done quite simply, we just need to assemble the panels together, then make the floor, electrical system, lights... But it is also necessary specific technical characteristics such as shielding efficiency, it is also calibrated by the Korean company with installation participation from the Chinese side.
The installation process was carried out by GCL HCM staff, along with Chinese engineers, under my supervision it was completed in the best way.
EMS shielding project is done with 3m Anechoic chamber, like RF, it is done quite simply, we just need to assemble the panels together, then make the floor, electrical system, lighting. .. But there also need to be specific technical characteristics such as Shielding efficiency which is also calibrated by the Korean company with installation participation from the Chinese side.
The installation process was carried out by GCL HCM staff, along with Chinese engineers, under my supervision it was completed in the best way.